Step 03 of 03 / What does it cost?
Build the initial
capital budget.
Every figure below is an editable per-villa planning allowance, not a supplier quotation. Replace each one as verified information arrives. The live total covers all three villas and the shared site.
- 3
- villas in scope
- 1 + 2
- Coral Estate + hotel
- × 3
- per-villa figures multiplied
Figures are locked. Choose Edit figures to change any allowance.
- 01
One budget, three villas The total covers all three villas.
- 02
Replace allowances Enter verified figures per villa as they arrive.
- 03
Read the total Review the total for Coral Estate plus the two hotel villas.
Operating allocation
Three villas, two roles
The investor finances all three villas. V03 is the proposed Coral Estate, managed by the investor; V01 and V02 are the proposed hotel villas. Per-villa allowances are multiplied by three to reach the full capital requirement.
Initial investment
Editable USD per-villa allowances
Factory and supplier scope
Import and delivery
Site and tropical adaptation
Professional completion
Go beyond initial capital
Open Lighthouse.
Start with the current three-villa, six-suite concept or test an inventory of up to ten villas. Lighthouse connects the selected development cost with editable occupancy, price per night and operating margin.
Open Lighthouse modelDetails, when you want them
01Received supplier layout
The dimensional basis behind the allowances


Editable initial-budget workspace. Values stay in this browser only. This is not an investment return model.